研究成果
会议论文|Economic optimisation of the actions of an enhanced Operational Tripping Scheme
发布时间:2022年05月12日 21:57    作者:    点击:[]

Economic optimisation of the actions of an enhanced Operational Tripping Scheme


作者:Yuhang Cong; Zhaoyang Jin; Peter Wall; Vladimir Terzija; Mark Osborne

摘要:The growing availability of real-time data (e.g. wide area monitoring) in power systems makes it possible for the less time sensitive aspects of protection to both deliver a secure, selective response and consider economic requirements. An operational tripping scheme (OTS) trips generation to prevent the cascading thermal overload of transmission lines after multiple line outages. This paper presents an enhanced OTS that calculates dynamic thermal line ratings (DTLRs) online to replace the conservative static line ratings presently in use and minimize unnecessary generation tripping. Furthermore, the time available before a thermal overload can be estimated and used as the basis for the economic optimization of the OTS actions. This allows generation tripping to be replaced with less invasive and cheaper generation re-dispatch. The DTLR-OTS is studied using simulations of the full GB power system. The new scheme is an example of a Wide Area Monitoring, Protection and Control (WAMPAC) application.

发表于:2016 Power Systems Computation Conference (PSCC)


上一条:会议论文|Creating a WAMS for the GB power system and the lessons learned so far 下一条:期刊论文|Power system anomaly detection using innovation reduction properties of iterated extended kalman filter

关闭

Copyright © 2021 All rights reserved. 版权所有:yl23411永利(集团)有限公司|官网科研团队 电话:0531-88392369 传真:0531-88392369 yl23411永利集团官网千佛山校区 济南市经十路17923号 邮编 250061 yl23411永利集团官网兴隆山校区 济南市二环东路12550号 邮编 250002