研究成果
会议论文|Creating a WAMS for the GB power system and the lessons learned so far
发布时间:2022年05月12日 21:58    作者:    点击:[]

Creating a WAMS for the GB power system and the lessons learned so far


作者:Peter Wall; Papiya Dattaray; Zhaoyang Jin; Priyanka Mohapatra; James Yu; Phil Ashton; Mark Osborne; Stuart Clark; Karine HAY; Douglas WILSON; Vladimir Terzija

摘要:The creation of a Wide Area Monitoring System (WAMS) has been established as an effective solution for many of the challenges faced by modern power systems. However, the complexity and cost of a WAMS means that it is not simple to determine its optimal nature or to justify the use of customer money to create it. VISOR is an innovation project in Great Britain (GB) that, through collaboration between industry and academia, has created the first WAMS to integrate, study and analyse synchronized measurements from the entire GB system in real time. This paper presents the WAMS that has been created in the GB power system and the oscillation monitoring tools deployed as part of it. These include new source location tools and a novel use of real time waveform measurements to monitor power system oscillations up to 46 Hz. Furthermore, the paper reports a number of performance issues that have been encountered during the creation of this WAMS, which will inform the future roll out of WAMS in GB.

发表于:Mediterranean Conference on Power Generation, Transmission, Distribution and Energy Conversion (MedPower 2016)


上一条:会议论文|An Adaptive Short-Term Frequency Stabilization Method for Doubly Fed Induction Generators Considering Power Margins 下一条:会议论文|Economic optimisation of the actions of an enhanced Operational Tripping Scheme

关闭

Copyright © 2021 All rights reserved. 版权所有:yl23411永利(集团)有限公司|官网科研团队 电话:0531-88392369 传真:0531-88392369 yl23411永利集团官网千佛山校区 济南市经十路17923号 邮编 250061 yl23411永利集团官网兴隆山校区 济南市二环东路12550号 邮编 250002